Main objects, on which our specialists worked:
  1. Sugar factory in Savincy village Kharkov region
    the montage and adjustment of measurements and automations facilities of three boiler aggregate at period 1995-1996 years.
  2. Kremenchug Thermoelectric Plant
    overhauls of automation and instrumentation of boilers ¹ 1 4, turbines ¹ 1 4 at the period 1995-2004 years.
  3. Kharkov Thermoelectric Plant ¹5
    overhauls and running repairs of automation and instrumentation of blocks ¹ 1 -3 at the period 1995-2001 years.
  4. Enakievo Metallurgical Works
    technical supervision of overhauls and running repairs of turbo-sets since 1996 to nowdays.
  5. Mariupol Integrated Iron-and-Steel Plant named after Iliich
    technical supervision of overhauls and running repairs of turbo-sets at the period 1999 - 2006 years.
  6. Kharkov Thermoelectric Works ¹ 3; Harcizskiy Rope Works; Sugar Refinery in Chapaevo village Kharkov Region
    the montage and adjustment of measurement and automations facilities of turbo-sets of different powers at the period 1999 - 2002 years.
  7. Zmiev Steam Power Plant
    rust protection covering of energetic equipment since 1999 to nowdays.
  8. Zmiev Steam Power Plant
    overhauls and running repairs of automation and instrumentation of blocks ¹ 1 10 since 2000 to nowdays.
  9. Zmiev Steam Power Plant
    installation of the block ¹ 8 of 300 M Watt as as the contractors of JSV "Siemens" (Germany) at the period 2001 2002 years, also at this Block a number of works by the order of the " Alstom" Company (Germany) have been executed.
  10. Starobeshevo Steam Power Plant
    reconstruction automatic process control system at the Block ¹ 4 of 200 Mwatt as the contractors of JSV "Siemens" (Germany) at the period 2003 2005 years.
  11. Zuev Power Plant
    montage and adjustment of automation and instrumentation of electric equipment ¹ 4 at the period 2004 2005 year.
  12. Oilextract Plant "Kolos", Kharkov Region
    montage and adjustment measurement and automations facilities at the period 2004-2005 year.
  13. Starobeshevo Steam Power Plant
    part-montage works of the energetic equipment damaged during the fire. The Customer -"Lurgi Lentjes" (Germany), at the period 2005-2006 year.
  14. "Donzement" firm Donezk Region
    project, produce and montage of electric and automation and instrumentation equipment of the stove ¹ 8 at the period 2006 year.
  15. Zuev Steam Power Plant
    Modernization vibrocontrol systems of secondary equipment. 2008 year
  16. Kurakhovo Steam Power Plant
    Montage of vibration monitoring system “VIDAS” 2008-2009 years.
  17. “Alliance Stekloplastic” JSC
    Mounting and commissioning of measuring means and control equipment of glass fiber single-stage manufacturing. 2008-2009 years.
 

Response

Tel./fax: +38 (057) 392-20-17
+38 (057) 713-82-54
Address: 61091, Kharkov,
Kharkovskih Divizij street,
house 14, building 3, p. box 7328
E-mail: info@energetik-ua.com
info_kom@energetik-ua.com